← All stories
● Covered by 1 source · 1 reportMedium impact1 neutral

AI Data Centers Use Converted Jet Engines for Power Due to Grid Delays

🔄 Updated 3d ago
New to BrevFeed? We gather this story from every outlet covering it into one summary — ranked by real-world impact, not just the latest headline — so you never miss what matters. What is BrevFeed? →

Key points

  • AI data centers face years-long waits for grid connections.
  • Converted jet engines provide faster power generation.
  • xAI and OpenAI are using these engines for their data centers.
  • Engines are less efficient and more polluting than conventional turbines.

Addressing Power Supply Delays

AI data centers are turning to converted jet engines to generate their own electricity, a solution driven by extensive delays in connecting to the main power grid and acquiring new turbines. These delays can stretch for years, impacting the rapid expansion required for AI infrastructure.

The primary advantage of using these rebuilt engines, which burn natural gas, is the speed at which they can be deployed. An analyst from Rystad Energy noted that data centers can be operational within 24 months using jet-powered units, compared to approximately seven years for a 100-megawatt grid connection in some regions.

Industry Adoption and Examples

Elon Musk's xAI has already installed eight converted jet-engine turbines from ProEnergy in Mississippi to power its Colossus 2 data center in Memphis. OpenAI is also following this trend, planning to use gas turbines at its first Stargate site in Abilene, Texas, with Crusoe, an AI data center builder, ordering 13 units for that campus.

These deployments highlight a growing trend among major AI players to find alternative power solutions to meet their immediate energy demands.

Trade-offs and Challenges

While offering a quick power solution, converted jet engines come with drawbacks. They are less efficient and produce more pollution compared to turbines specifically designed for conventional power generation. This presents an environmental trade-off for the speed of deployment.

The reliance on these engines underscores the significant gap between the rapid growth of AI infrastructure and the slower pace of traditional energy grid development.

✨ This summary was generated by AI from the outlets' reporting listed below. It is not independently verified and may contain errors — check the original sources. How BrevFeed works →

The daily brief

One email each morning: the day's tech stories, clustered across outlets and summarized. No account needed.

One email a day. Unsubscribe in one click, any time.

Today's brief

Spend a few minutes, get the whole day. Every topic's top stories in one hands-free rundown — listen, watch, or read the transcript.

~4 min · 3 stories · Nov 07

▶ Play today's brief Listen on Spotify

New every morning, and the back catalogue is archived by date.

Reporting from

Some AI data centers are deploying converted jet engines to generate electricity, bypassing long waits for grid connections and new turbines. This approach allows data centers to become operational faster, addressing power supply shortages that hinder AI infrastructure expansion.